No | Project Title | Client / Developer |
1 |
Cooling tower project in Johor:- |
MMC Engineering Services Sdn. Bhd. |
2 |
Pengerang Project in Johor RAPID Project:- |
Muhibbah Engineering Sdn Bhd Wabag Muhibbah JV Sdn. Bhd. |
Industrial Building
No | Project Title | Client / Developer |
1 |
a) Turning Plates in PTP Johor |
Pelabuhan Tanjung Pelepas |
2 |
JB Cocoa Food Plant Project in Pelabuhan Tanjung Pelepas:-
i.JB Cocoa Warehouse Extension at Pelabuhan Tanjung Pelepas.
(Part I) |
|
3 |
2 Storey Warehouse 3E Project in Johor Port:- Construction and Completion Of Two Storey Warehouse 3E and All Ancillary Works at Johor Port for Johor Port Berhad. (Completed year : 2018) |
MMC Engineering & Construction Sdn Bhd |
4 |
Main Building Works For Proposed Annexed Building To Existing Factory (Cocoa Plant) On Lot Cp1 And Cp3b (Ptd 2423) (Completed year : 2012) |
Chee Kong Sdn. Bhd |
5 |
Warehouse at Pasir Gudang for Messrs Pantech Stainless & Alloy Industries Sdn Bhd Completed year : 2012) |
Chee Kong Sdn Bhd |
6 |
Proposed construction and completion Of single factory with double storey office, guard house, sub station, pump room and bin centre on Lot D20 , mukim Tanjung Pelepas, Daerah Johor Bahru , Johor Bahru Takzim for mess's specialized Technology Resources (Malaysia) Sdn. Bhd. (Phase II) (Completed year : 2010) |
Malpakat Construction Sdn. Bhd |
Water Treatment Plant
No | Project Title | Client / Developer |
1 |
Water Treatment Plant Project in Selangor:- |
Salcon MMCB AZSB JV |
2 |
Water Treatment Plant Project in Johor:- Proposed upgrading, rehabilitation and extension of existing Semangar Water Treatment Plant, Kota Tinggi, Johor. (Completed year 2012) |
Southern Water Technology Sdn Bhd |
Infrastructure
No | Project Title | Client / Developer |
1 |
Remedial Works at Port Klang |
MMC Engineering Sdn Bhd |
2 |
Sapura Lumut:- Proposed Upgrading Jetty 8 at Plot D1, Lumut Port Industrial Park , Kg.Acheh, Mukim of Lumut Daerah Manjung, 32000 Setiawan, Perak Darul Ridzuan a) Skid Beam b) Monsoon Drain (Completed year : 2019) c) Piling Work SO 4100041908 (Completed year : Oct’20) d) Civil Work – Road Crossing (SO 4100051352) (Completed year : July’20) e) Civil Work – Workshop 7 & 10. (SO 4100051289) (Completed year : Aug’20) |
Sapura Fabrication Sdn Bhd |
3 |
Mercedes Showroom in Tampoi, Johor : Proposed addiction @ Addition & Alteration to Existing Car Exhibition Building Office & Service Workshop of Mercedez – Benz on Lot 421, Jalan Skudai, Tebrau Johor.
(a) Drainage
(b) Road & Signage
(Completed year : 2019) |
Cycle & Carriage Bintang Berhad |
4 |
Roadwork Project in Johor :- Permanent Access Roadworks for Pengerang Cogeneration Plant at Refinery and Petrochemical Integrated Development (RAPID) Complex at Pengerang in Johor. (Completed year 2016 ) |
Kem Askar Timbalan Setia Negeri (TSN) |
5 |
Construction and completion of outfall structure No.1 & 2 / Distripark 3 nos of sub-station building / CTY Phase II / Road works. (Completed year 2014) |
MMC Engineering & Construction Sdn. Bhd. |
6 |
The Construction and Completion of Crane Rail Support in Relation to the Land Transportation and Assembly of Five (5) IMPSA Quay Cranes at Lumut, Perak. (Completed year : 2013) |
Leycom Maritime Sdn Bhd |
7 |
1) Additional and Maintenance works at PTP phase I, included: a) RC turning plate, cement bond materials at Pavement b) Workshop additional c) Additional container stacking beam d) Extension trailer parking f) Access road to gate keeper house with RC bridge g) Maintenance warehouse painting i) Container yard road marking & container yard stack marking j) Reefer stack steel structure modification works Design & Build k) Additional & remedial works to Pavement, etc : Returning plate interlocking Pavement, road marking l) Maintenance work at PTP phase 1 2) a) The extension to existing workshop and associated works. b) Maintenance and remedial works of terminal yard part 1 building, utilities trench works and associated works. 3) Remedial works at PTP:- a) Remedial works to CTY Wharf and ACO drains b) Maintenance and remedial works of Terminal Yard 4) i) Distripark road works at PTP Phase II ii) Supply of manpower and machinery for Construction and completion of access box culvert crossing K- drain. (Completed year : 2007) 5) PTP project:- a) Cadangan pembangunan Pelabuhan Tanjung Pelepas Phase II the construction , completion and maintenance of container terminal yard Block 16, 17 & 18 (Completion of Raw A ~ D 4 rows of Block 16, 17 & 18) b) MMC, CTY 2, Block 16, 17 & 18, road works option 1, main sub-contractor, inclusive labour machine and material (Completed years : 2010) 6) a) The construction, completion & maintenance for extension of existing container repairs area & associated works at Pelabuhan Tanjung Pelepas (PTP). b) Maintenance and remedial works of building architectural items at Pelabuhan Tanjung Pelepas (PTP). c) Remedial work on wharf road of terminal yard area at Pelabuhan Tanjung Pelepas (PTP). (Completed year : 2011) 7) The Construction and Completion of New Motorcycle & Car Park Works at PUB Area at Pelabuhan Tanjung Pelepas (Completed year : April 2012) 8) Premix Resurfacing Work at Distripark Area (Completed September 2020) |
Pelabuhan Tanjung Pelepas Sdn Bhd. |
8 |
‘Shrimp Hatchery’ Lembah Makanan Organik Oleh Perbadanan Bioteknologi & Biodiversiti, Daerah Kota Tinggi, Johor. (Completed year 2011) |
ML Construction Sdn Bhd (KAJIMA) |
9 |
Cadangan membina dan menyiapkan Jalan Utama dari Jalan Seelong ke Taman Impian Emas , Mukim Tebrau , Daerah Johor Bahru (Completed year : 2010) |
SP Mulia Sdn. Bhd. |
10 |
Construction & Completion drainage & RC works for subsea facility for Cameron International Malaysia System Sdn. Bhd. at port of Tanjung Pelepas (Completed year : 2008) |
Mudajaya Corporation Berhad |
11 |
Road & Drainage works for Jurong Hi-Tech INDUSTRIES Pte. Ltd. At Bandar Nusajaya (Completed year : 2008) |
Malpakat Construction Sdn. Bhd. |
12 |
Additional works at CTY 13 ~ 15: a) CTY 13 ~ 15, The construction, completion and maintenance road works and associated works. b) CTY 13 ~ 15, Sub-contract for the construction & completion of substation building, utilities trench works and associated works c) CTY 13 ~ 15, The construction, completion & maintenance of Civil and structural works for container stacks, Drainage, Foundation for refer stacks & associated works d) Back of Wharf, Road works , Road Marking , Interlocking, Pavement laying. (Completed year : 2008) |
MMC Engineering & Construction Sdn. Bhd. |
Healthcare
No | Project Title | Client / Developer |
1 |
KPJ Johor Specialist Jalan Sultan Abdul Samad
i)Cadangan Ubahan Tambahan Di Bawah Undang- Undang Kecil Bangunan Seragam 1686 Ke Atas Aras 1 & 3 Yang Merangkumi Ruang Sessional Clinic (PCB) & Health Screening.
Architectural & M&E Works
ii)Cadangan Ubahan Tambahan Di Bawah
Undang-Undang Kecil Bangunan Seragam |
KPJ Johor Specialist |
2 |
Specialist Hospital Project in Johor:-
i)1 Unit Bangunan 9 Tingkat
ii)1 Unit Kebuk Sampah
Di atas PTD 913374, Jalan Saujana Utama, Taman Saujana Kluang , Mukim Kluang Daerah Kluang, Johor Darul Takzim Untuk Tetuan Kluang Specialist Hospital Sdn Bhd. |
Sena Letrik (M) Sdn Bhd |
3 |
Specialist Hospital Project in Johor:-
i.KPJ Hospital - Cadangan Membina Hospital Pakar 8 tingkat, Taman Bukit Dahlia / Cadangan Ubahan Tambahan Ke Atas Aras 4, 5, 6, Dan 7 (Inpatient), Hospital Pakar Johor / Cadangan Ubahan,Tambahan dan Menyiapkan Bangunan Tambahan Enam (6) Tingkat Di Hospital Pakar Puteri.
(Completed year 2014)
ii.Proposed Iskandar Gleneagles Medini Hospital Development, Mukim Pulai, Nusajaya, Johor Darul Takzim
(Completed year 2015) |
KPJ Healthcare Technical Service Sdn Bhd. Obayashi Corporation |
Instituition Infrastructure
No | Project Title | Client / Developer |
1 |
School Project in Johor:-
i.-Cadangan Pembangunan Sekolah Menengah Berasrama Penuh Di Atas Sebahagian Lot PTD 154971, Mukim Pulai, Daerah Johor Bahru, Johor DT. – Academic Block
(Completed year 2011)
- Membina dan menyiapkan 2 blok 4 tingkat |
Detect Engineering Sdn. Bhd. Impact Group Sdn. Bhd. |
Heavy Industrial
No | Project Title | Client / Developer |
1 |
SMART WTE in Lukut, Negeri Sembilan
|
KNM Process System Sdn Bhd Cypark Sdn. Bhd |
2 |
Container Terminal Yard and Ancillary Works Project in Johor Port:- Rehabilitation Works of Container Terminal Yard and Ancillary Works at Johor Port.
-Interlocking Pavement at Yard 6C3
-Completion of Weighbridge
(Completed year 2015) |
Johor Port Berhad |
3 |
Cameron Subsea facilities (Phase II) Tanjung Pelepas Johor, Johor – Plant work (Completed year : October 2009) |
Zublin – Pasukhas Joint Venture |
Commercial
No | Project Title | Client / Developer |
1 |
Hap Seng Business Park |
Hap Seng Logistics Sdn Bhd |
2 |
General Building Project:- i. Cadangan Membina Tambahan Pawagam di Kompleks Membeli-belah (AEON) sediada di Nusajaya, Mukim Pulai, Johor. (Completed year 2011) |
BLHE Sdn Bhd |
3 |
Membina dan menyiapkan Pusat Perusahaan Tenun dan kerja-kerja berkaitan untuk kompleks industri & rekreasi felda Chini 3, Pekan , Pahang. (Completed years : 2010) |
HZ Haza Sdn. Bhd |
Residential
No | Project Title | Client / Developer |
1 |
Bungalow project, Danga Bay, Johor The execution and completion of bungalow show house type J “Monte Carlo” PTB 22673 dan sebahagian lot PTB 20704, Batu 4-1/2, Jalan Skudai, Danga Bay, Johor |
Ekovest Construction Sdn. Bhd. |
2 |
Pembinaan, Penyiapkan dan Penyelenggaraan untuk kerja-kerja tanah, perparitan sementara dan kerja-kerja berkaitan untuk Lot perdagangan di sebahagian precint 1 bagi cadangan perumahan di atas Lot PTD 63733, Taman Setia Tropical, Mukim Tebrau, Daerah Johor Bahru, Johor Daruk Takzim untuk tetuan Setia Indah Sdn. Bhd. (Completed year : 2010) |
SP SETIA Sdn. Bhd. |
Earthwork , Roadwork & Drainage
No | Project Title | Client / Developer |
1 |
New VVIP Hangar Project at Senai Airport:-
i.Proposed Development of ‘’Senai Airport City’’ Appointment of Sub-Contractors for Senai Airport City (SAC) Phase 1(b).
(Completed year 2015)
|
Senai Airport Terminal |
2 |
New VVIP Hangar Project at Senai Airport:-
i.Senai Airport Aviation Centre : Phase 2 The Provision of a New VVIP Hangar, Parking Apron, Taxiways and Associated Works at Senai International Airport.
(Completed year 2015) |
Senai Airport Terminal |
3 |
The Construction, Completion and Maintenance of Wharf Structures Berth 13 & 14 and Back of Wharf Works at Pelabuhan Tanjung Pelepas (PTP) – Subcontract for Earthworks, Drainage Works, Road Marking & Furniture, Pavement, Utility and Building Structure Works and Precast (Completed year 2014) |
Zelan Construction Sdn Bhd |
4 |
Earthwork & Drainage Project in Johor:
i)116 Units (RMM) Double Storey Cluster Terrace
Houses (18’x 60’) & 30 Units (RMM) Double Storey Terrace Houses (18’ x 60’)
ii)174 Units (RMM) Double Storey Cluster Terrace
(Completed years : 2010)Houses (18’ x 60’) & 35 Units (RMM) Double Storey Terrace Houses (18’ x 60’) At Zone 3, PTD 117035 Setia Business Park II, Mukim Tebrau Daerah Johor Bahru. (Completed year : August 2018) iii) Pembinaan, Penyiapan dan Penyelenggaraan untuk Cadangan Jalan, Perparitan dan Kerja-Kerja Berkaitan untuk Precint 7 dan Sebahagian Precint 8 & 9 Bagi Cadangan Perumahan Di Atas Lot PTD 63733, Mukim Tebrau, Daerah Johor Bahru, Johor.(Completed year 2012) iv) Pembinaan, Penyiapkan dan Penyelenggaraan untuk kerja-kerja tanah, perparitan sementara dan kerja-kerja berkaitan untuk Lot perdagangan di sebahagian precint 1 bagi cadangan perumahan di atas Lot PTD 63733, Taman Setia Tropical, Mukim Tebrau, Daerah Johor Bahru, Johor Daruk Takzim untuk tetuan Setia Indah Sdn. Bhd. |
Setia Indah Sdn Bhd SP Setia |
5 |
Earthworks & ancillaries work at PLO 3 Jalan Pekeliling Pasir Gudang, Johor (Completed year : 2009) |
Crescendo Infra Sdn. Bhd. |
6 |
SMART WTE in Lukut, Negeri Sembilan Solid Waste Modular Advanced Recovery and Treatment Systems Waste Management Solutions (SMART WTE) at Ladang Tanah Merah, Negeri Sembilan i. Backfilling Work (Completed in September 2020) |
Cypark Sdn Bhd |