Completed Project
Power Plant

No Project Title Client / Developer
1

Cooling tower project in Johor:-

Package B – Main Civil Works for First Eight 
(8) Cells of Cooling Tower Structures (30URA)
(“the Works”) For Pengerang Cogeneration
Plant at Refinery and Petrochemical Integrated    
Development (RAPID) Complex at Pengerang
in Johor.

(Completed year 2016)

MMC Engineering Services Sdn. Bhd.
 
2

Pengerang Project in Johor RAPID Project:-

Provision of Labour for Reinforced Concrete Work.
 
i. RC Works at Substation 521, Field Auxilary
   Room (FAR521) & Substation 473
   (Completed year : 2017)

ii. Package 16A – Re-FEED, Engineering, 
    Procurement, Construction and
Commisioning
    of the Effluent Treatment Plant for RAPID
    Project in Pengerang, Johor.

    (Completed year : 2018)

Muhibbah Engineering Sdn Bhd


Wabag Muhibbah JV Sdn. Bhd.
 

Industrial Building

No Project Title Client / Developer
1

a) Turning Plates in PTP Johor
The enhancement of Turning Plates at Phase 1 of Pelabuhan Tanjung Pelepas
(26/11/2019 – 30/4/2020)

b) Remedial Work in PTP Johor
i. Remedial Work at Road 4 (Block 6) Northbound
 
(1/6/2020 – 31/7/2020)

ii. The Remedial Works of Subsidence Area at
    Container Yard Block 10 Row C & D
   
(28/5/2020 – 12/10/2020)

Pelabuhan Tanjung Pelepas
 
2

JB Cocoa Food Plant Project in Pelabuhan Tanjung Pelepas:-
 

i.JB Cocoa Warehouse Extension at Pelabuhan Tanjung Pelepas. 

        (Part I)
        (Completed year 2018)

ii. Cadangan Membina Tambahan Gudang
      
Kepada Kilang Sediada di atas Lot CP1,
       CP3B & CP3D (PTD 2423), Jalan
Tanjung
       A6, Pelabuhan Tanjung Pelepas, Mukim  
      
Tanjung Pelepas, Johor Darul Takzim Untuk
       Tetuan JB Cocoa Sdn Bhd.
       (Part II, III & IV)
        (Completed year 2019)
 

 
3
 
2 Storey Warehouse 3E Project in Johor Port:-

Construction and Completion Of Two Storey Warehouse 3E and All Ancillary Works at Johor Port for Johor Port Berhad.
(Completed year : 2018)
 
MMC Engineering
&
Construction
Sdn Bhd
 
4
 
Main Building Works For Proposed Annexed Building To Existing Factory (Cocoa Plant) On Lot Cp1 And Cp3b (Ptd 2423)
(Completed year : 2012)
 
Chee Kong Sdn. Bhd
 
5
 
Warehouse at Pasir Gudang for Messrs Pantech Stainless & Alloy Industries Sdn Bhd
Completed year : 2012)
 
Chee Kong Sdn Bhd
 
6
 
Proposed construction and completion Of single factory with double storey office, guard house, sub station, pump room and bin centre on Lot D20 , mukim Tanjung Pelepas, Daerah Johor Bahru , Johor Bahru Takzim for mess's specialized Technology Resources (Malaysia) Sdn. Bhd. (Phase II)
(Completed year : 2010)
 
Malpakat Construction Sdn. Bhd
 

Water Treatment Plant

No Project Title Client / Developer
1

Water Treatment Plant Project in Selangor:-
Proposed Development of Langat 2, Water Treatment Plant and Water Reticulation System in Selangor.
Construction and Completion of 1130MLD Langat 2 Water Treatment Plant.
(Completed year : 2018)
 

Salcon MMCB AZSB JV

 
2 Water Treatment Plant Project in Johor:- 

Proposed upgrading, rehabilitation and extension of existing Semangar Water Treatment Plant, Kota Tinggi, Johor.
(Completed year 2012)
Southern Water Technology Sdn Bhd

Infrastructure

No Project Title Client / Developer
1

Remedial Works at Port Klang
Remedial Works of Existing Terminal Pavement at Kontena Nasional Berhad (KNB)
(27/7/2020 – 23/9/2020)

MMC Engineering Sdn Bhd
 
2 Sapura Lumut:-
Proposed Upgrading Jetty 8 at Plot D1, Lumut Port Industrial Park , Kg.Acheh, Mukim of Lumut Daerah Manjung, 32000 Setiawan, Perak Darul Ridzuan
a) Skid Beam 
b) Monsoon Drain
(Completed year : 2019)

c) Piling Work SO 4100041908
(Completed year : Oct’20)

d) Civil Work – Road Crossing (SO 4100051352)
(Completed year : July’20)

e) Civil Work – Workshop 7 & 10. (SO 4100051289)
(Completed year : Aug’20)
Sapura Fabrication Sdn Bhd
3
 
Mercedes Showroom in Tampoi, Johor :

Proposed addiction @ Addition & Alteration to Existing Car 
Exhibition Building Office & Service
Workshop of 
Mercedez – Benz on Lot 421, Jalan SkudaiTebrau Johor. 

(a) Drainage
(b) Road & Signage
(Completed year : 2019)
Cycle & Carriage Bintang Berhad
 
4
 
Roadwork Project in Johor :-
Permanent Access Roadworks for Pengerang 
Cogeneration Plant at Refinery and  Petrochemical Integrated Development (RAPID) Complex at 
Pengerang in Johor.
(Completed year 2016 )
Kem Askar Timbalan Setia Negeri (TSN)
 
5
 

Construction and completion of outfall structure No.1 & 2 / Distripark 3 nos of sub-station building / CTY Phase II / Road works. 
(Completed year  2007)

The Construction, Completion and Maintenance of New Container Terminal Yard Infra Structure, Road Works and Workshop Buildings.
(Completed year 2014)

MMC Engineering & Construction Sdn. Bhd.
 
6
 
The Construction and Completion of Crane Rail Support in Relation to the Land Transportation and Assembly of Five (5) IMPSA Quay Cranes at Lumut, Perak.
(Completed year : 2013)
Leycom Maritime Sdn Bhd
 
 
7
 
1) Additional and Maintenance works at PTP phase I, included:
a) RC turning plate, cement bond materials at Pavement 
b) Workshop additional 
c) Additional container stacking beam 
d) Extension trailer parking 
f) Access road to gate keeper house with RC bridge
g) Maintenance warehouse painting
i) Container yard road marking & container yard stack marking
j) Reefer stack steel structure modification works Design & Build
k) Additional & remedial works to Pavement, etc :      Returning plate interlocking Pavement, road marking 
l) Maintenance work at PTP phase 1

2) 
a) The extension to existing workshop and associated works.
b) Maintenance and remedial works of terminal yard part 1 building, utilities trench works and associated works.

3) Remedial works at PTP:-
a) Remedial works to CTY Wharf and ACO drains
b) Maintenance and remedial works of Terminal Yard  

4) i)  Distripark road works at PTP Phase II
    ii) Supply of manpower and machinery for Construction
        and completion of access box culvert crossing K-
        drain.

    (Completed year : 2007)

5) PTP project:-
a)  Cadangan pembangunan Pelabuhan Tanjung Pelepas
     Phase II the construction , completion and maintenance of    

     container terminal yard Block 16, 17 & 18 (Completion of
      Raw A ~ D 4 rows of Block 16, 17 & 18)


b) MMC, CTY 2, Block 16, 17 & 18, road works option 1, main
    sub-contractor, inclusive 
labour machine and material 
    (Completed years : 2010)

6) 
a) The construction, completion & maintenance for extension of existing container repairs area & associated works at Pelabuhan Tanjung Pelepas (PTP).
b) Maintenance and remedial works of building 
    architectural items at 
Pelabuhan Tanjung Pelepas
    (PTP).

c) Remedial work on wharf road of terminal yard area at
    
Pelabuhan Tanjung Pelepas (PTP).
(Completed year : 2011)

7) The Construction and Completion of New Motorcycle 
    & Car Park Works at PUB Area at 
Pelabuhan Tanjung
   Pelepas
   (Completed year : April 2012)

8) Premix Resurfacing Work at Distripark Area
(Completed September 2020)
Pelabuhan Tanjung Pelepas Sdn Bhd.
 
8 ‘Shrimp Hatchery’ Lembah Makanan Organik Oleh
 
Perbadanan Bioteknologi & Biodiversiti, Daerah 
 Kota Tinggi, Johor.
 
(Completed year 2011)
ML Construction Sdn Bhd
(KAJIMA)
 
9 Cadangan membina dan menyiapkan Jalan Utama dari Jalan Seelong ke Taman Impian Emas , Mukim Tebrau , Daerah Johor Bahru
(Completed year : 2010)

 
SP Mulia Sdn. Bhd.
 
10 Construction & Completion drainage & RC works for subsea facility for Cameron International Malaysia System Sdn. Bhd. at port of Tanjung Pelepas
(Completed year : 2008) 
Mudajaya Corporation Berhad
 
11 Road & Drainage works for Jurong Hi-Tech INDUSTRIES Pte. Ltd. At Bandar Nusajaya
(Completed year : 2008)
Malpakat Construction Sdn. Bhd.
 
12 Additional works at CTY 13 ~ 15:
a) CTY 13 ~ 15, The construction, completion and  
    maintenance road works and associated works.
b) CTY 13 ~ 15, Sub-contract for the construction &   
    completion of  substation building, utilities trench  
   works and associated works
c) CTY 13 ~ 15, The construction, completion &
    maintenance of Civil and structural works for
    container stacks, Drainage, Foundation for refer
    stacks & associated works
d) Back of Wharf, Road works , Road Marking ,
    Interlocking, Pavement laying.
   (Completed year : 2008)

 
MMC Engineering & Construction Sdn. Bhd.
 

Healthcare

No Project Title Client / Developer
1

KPJ Johor Specialist Jalan Sultan Abdul Samad
 

i)Cadangan Ubahan Tambahan Di Bawah Undang- Undang Kecil Bangunan Seragam 1686 Ke Atas Aras 1 & 3 Yang Merangkumi Ruang Sessional Clinic (PCB) & Health Screening.

        Architectural & M&E Works
        (08/07/2019 –18/12/2019)

        Interior Design Works ( 7/11/2019-
        18/12/2019)
       
- Completed Year 2019
 

ii)Cadangan Ubahan Tambahan Di Bawah

       Undang-Undang Kecil Bangunan Seragam
       1686 Ke Atas Aras 4 Yang Merangkumi 
       
Ruang Temporary Audiologi
       (1/9/2019 – 29/02/2020) 
 

KPJ Johor Specialist
 
2

Specialist Hospital Project in Johor:-
Cadangan Pembinaan Pusat Perubatan Swasta Yang Mengandungi:

i)1 Unit Bangunan 9 Tingkat
ii)1 Unit Kebuk Sampah

Di atas PTD 913374, Jalan Saujana  Utama, Taman Saujana Kluang , Mukim Kluang Daerah Kluang, Johor Darul Takzim Untuk Tetuan Kluang Specialist Hospital Sdn Bhd.
(Completed year 2018)
 

Sena Letrik (M) Sdn Bhd
 
3
 
Specialist Hospital Project in Johor:-
i.KPJ Hospital -  Cadangan Membina Hospital Pakar 8 tingkat, Taman Bukit Dahlia / Cadangan Ubahan Tambahan Ke Atas Aras 4, 5, 6, Dan 7 (Inpatient), Hospital Pakar Johor / Cadangan Ubahan,Tambahan dan Menyiapkan Bangunan Tambahan Enam (6) Tingkat Di Hospital Pakar Puteri.
 
(Completed year 2014)
ii.Proposed Iskandar Gleneagles Medini Hospital Development, Mukim Pulai, Nusajaya, Johor Darul Takzim
(Completed year 2015) 

KPJ Healthcare Technical Service Sdn Bhd.





Obayashi Corporation

Instituition Infrastructure

No Project Title Client / Developer
1

School Project in Johor:-

i.-Cadangan Pembangunan Sekolah Menengah Berasrama Penuh Di Atas Sebahagian Lot PTD 154971, Mukim Pulai, Daerah Johor Bahru, Johor DT. – Academic Block 
(Completed year 2011)

        -  Membina dan menyiapkan 2 blok 4 tingkat  
        bangunan gantian dan lain-lain kerja
        berkaitan, di Sek Keb. Seri Semangat, Benut,
        Johor.
       
(Completed year 2011)

ii. Membinakan dan menyiapkan sekolah di Sek. Keb. Ayer Manis, Kulai, Johor Bahru & 2 Blocks of Sek. Keb. Bandar Pontian, Johor.
(Completed year : 2010)
 

Detect Engineering Sdn. Bhd.








Impact Group Sdn. Bhd.
 

Heavy Industrial

No Project Title Client / Developer
1

SMART WTE in Lukut, Negeri Sembilan  
(a) Solid Waste Modular Advanced Recovery and Treatment Systems Waste Management Solutions (SMART WTE) at Ladang Tanah  Merah, Negeri Sembilan     
Construction of Incinerator Bunker
(Completed year  : 2019)

(b) Construction & Completion of Salvaging Yard &
      Machinery Yard

(Completed year  : 2019)      

 


KNM Process System Sdn Bhd





Cypark Sdn. Bhd

 
2
 
Container Terminal Yard and Ancillary Works Project in Johor Port:-

Rehabilitation Works of Container Terminal Yard and Ancillary Works at Johor Port.
-Interlocking Pavement at Yard 6C3
-Completion of Weighbridge
(Completed year 2015)
Johor Port Berhad

 
3
 
Cameron Subsea facilities (Phase II) Tanjung Pelepas Johor, Johor – Plant work
(Completed year : October 2009)
 
Zublin – Pasukhas Joint Venture

Commercial

No Project Title Client / Developer
1

      

Hap Seng Business Park
Cadangan Pembangunan Skim Perindustrian Berstrata di No 12 (PT 364), Persiaran Perusahaan Seksyen 23, 40300 Shah Alam, Selangor
(RC Structure Subcontract for Labour & Formworks)
(1/8/2019- 31/3/2020) 


Hap Seng Logistics Sdn Bhd
 
2
 
General Building Project:-


i.    Cadangan Membina Tambahan Pawagam di
       
Kompleks Membeli-belah  (AEON) sediada di
       
Nusajaya, Mukim Pulai, Johor.
       
(Completed year 2011)
 
BLHE Sdn Bhd
 
3
 
Membina dan menyiapkan Pusat Perusahaan Tenun dan kerja-kerja berkaitan untuk kompleks industri & rekreasi felda Chini 3, Pekan , Pahang.
(Completed years : 2010)

 
HZ Haza Sdn. Bhd
 

Residential

No Project Title Client / Developer
1

    

Bungalow project, Danga Bay, Johor The execution and completion of bungalow show house type J “Monte Carlo” PTB 22673 dan sebahagian lot PTB 20704, Batu 4-1/2, Jalan Skudai, Danga Bay, Johor
(Completed year : 2011)
 

Ekovest Construction Sdn. Bhd.
 
2
 
Pembinaan, Penyiapkan dan Penyelenggaraan untuk kerja-kerja tanah, perparitan sementara dan kerja-kerja berkaitan untuk Lot perdagangan di sebahagian precint 1 bagi cadangan perumahan di atas Lot PTD 63733, Taman Setia Tropical, Mukim Tebrau, Daerah Johor Bahru, Johor Daruk Takzim untuk tetuan Setia Indah Sdn. Bhd.
(Completed year : 2010)
 
SP SETIA Sdn. Bhd.
 

Earthwork , Roadwork & Drainage

No Project Title Client / Developer
1

    

New VVIP Hangar Project at Senai Airport:-
 

i.Proposed Development of ‘’Senai Airport City’’ Appointment of Sub-Contractors for Senai Airport City (SAC) Phase 1(b).
(Completed year 2015)

 

Senai Airport Terminal
 
2
 
New VVIP Hangar Project at Senai Airport:- 

i.Senai Airport Aviation Centre : Phase 2 The Provision of a New VVIP Hangar, Parking Apron, Taxiways and Associated Works at Senai International Airport. 
(Completed year 2015)
 
Senai Airport Terminal
 
3
 
The Construction, Completion and Maintenance of Wharf Structures Berth 13 & 14 and Back of Wharf Works at Pelabuhan Tanjung Pelepas (PTP) – Subcontract for Earthworks, Drainage Works, Road Marking & Furniture, Pavement, Utility and Building Structure Works and Precast
(Completed year 2014)

Zelan Construction Sdn Bhd
 
4

 
Earthwork & Drainage Project in Johor:

i)116 Units (RMM) Double Storey Cluster Terrace
   Houses (18’x 60’) & 30 Units (RMM) Double
  
Storey Terrace Houses 
   (18’ x 60’)
ii)174 Units (RMM) Double Storey Cluster Terrace
   Houses (18’ x 60’)  & 35 Units (RMM) Double
  
Storey Terrace Houses
    (18’ x 60’)

At Zone 3, PTD 117035 Setia Business Park II,  Mukim
Tebrau Daerah  Johor Bahru.
(Completed year : August 2018)

iii) Pembinaan, Penyiapan  dan Penyelenggaraan untuk Cadangan Jalan, Perparitan dan Kerja-Kerja Berkaitan untuk Precint 7 dan Sebahagian Precint 8 & 9 Bagi Cadangan Perumahan Di Atas Lot PTD 63733, Mukim Tebrau, Daerah Johor Bahru, Johor.(Completed year 2012)

iv) Pembinaan, Penyiapkan dan Penyelenggaraan untuk kerja-kerja tanah, perparitan sementara dan kerja-kerja berkaitan untuk Lot perdagangan di sebahagian precint 1 bagi cadangan perumahan di atas Lot PTD 63733, Taman Setia Tropical, Mukim Tebrau, Daerah Johor Bahru, Johor Daruk Takzim untuk tetuan Setia Indah Sdn. Bhd.
(Completed years : 2010)
 
Setia Indah Sdn Bhd











SP Setia
 
5
 
Earthworks & ancillaries work at PLO 3 Jalan Pekeliling Pasir Gudang, Johor
(Completed year : 2009)
 
Crescendo Infra Sdn. Bhd.
6 SMART WTE in Lukut, Negeri Sembilan  
Solid Waste Modular Advanced Recovery and Treatment Systems Waste Management Solutions (SMART WTE) at Ladang Tanah  Merah, Negeri Sembilan     

i.     Backfilling Work
      
(Completed in September 2020)
Cypark Sdn Bhd
 

Switch To Desktop Version